Estimated Rebuild Cost

0 €

Comfort
25-534011_Plannen.pdf900028/05/2026Low confidence — 10%
Cost Breakdown
Three-category calculation with regional and ABEX index adjustments
Category€/m²Cost
CAT1 — Livable
CAT2 — Enclosed non-livable
CAT3 — Outdoor built
Subtotal0 €
× Regional coefficient× 0.973
After regional adjustment0 €
× ABEX index factor(index 1000)× 1.000
Total Rebuild Cost0 €
Price per m² Formula
Linear interpolation from finishing coefficient F between the configured min and max prices

Finishing Coefficient F

1.155

Comfort
BasicStandardComfortComfort+Luxury
// price per category:
price = min + (F − 0.70) / (1.500.70) × (max − min)
CategoryMin (F=0.7)Max (F=1.5)This buildingPosition
CAT1 — Livable
1 600 €2 900 €2 339 €
CAT2 — Enclosed
900 €1 500 €1 241 €
CAT3 — Outdoor built
500 €900 €727 €
Finishing Level Evidence
Quality/Quantity Parameters extracted from the building plan — sorted by model impactModel v102
36 parameters
ParameterScoreConfidenceWeightImpact
Has Wellness Area0.0010%+0.080
Has Dressing Room-0.3020%+0.060
Kitchen Appliance Count0.0010%+0.060
Has Kitchen Island0.0010%+0.050
Built-in Storage Count0.0010%+0.050
Bathroom Count+0.3020%+0.045
Has Fireplace+0.3030%+0.040
Bathroom Luxury Score0.0010%+0.040
Bathroom/Bedroom Ratio0.0010%+0.040
Separate Toilet Count0.0010%+0.030
Has Separate Dining0.0010%+0.030
Has Office/Study0.0010%+0.025
Adjustments & Metadata

Regional Coefficient

0.973

Postcode: 9000

ABEX Index Factor

1.000

Index value: 1000

Reference: 1000

Finishing Model

v102

e9380e41

Confidence Scores

SQM extraction0% — Low
QQP analysis20% — Low
Overall10% — Low

Processing Time

66.3s

Estimation ID: bfb5aeea-f41c-4c27-889a-df26a975b8b8