Estimated Rebuild Cost

0 €

Comfort
26-55355000070VerzamelPDF_20260428_1125.pdf850025/05/2026Low confidence — 28%
Cost Breakdown
Three-category calculation with regional and ABEX index adjustments
Category€/m²Cost
CAT1 — Livable
CAT2 — Enclosed non-livable
CAT3 — Outdoor built
Subtotal0 €
× Regional coefficient× 0.987
After regional adjustment0 €
× ABEX index factor(index 1000)× 1.000
Total Rebuild Cost0 €
Price per m² Formula
Linear interpolation from finishing coefficient F between the configured min and max prices

Finishing Coefficient F

1.133

Comfort
BasicStandardComfortComfort+Luxury
// price per category:
price = min + (F − 0.70) / (1.500.70) × (max − min)
CategoryMin (F=0.7)Max (F=1.5)This buildingPosition
CAT1 — Livable
1 600 €2 900 €2 303 €
CAT2 — Enclosed
900 €1 500 €1 224 €
CAT3 — Outdoor built
500 €900 €716 €
Finishing Level Evidence
Quality/Quantity Parameters extracted from the building plan — sorted by model impactModel v102
36 parameters
ParameterScoreConfidenceWeightImpact
Has Wellness Area0.0070%+0.080
Has Dressing Room-0.5070%+0.060
Kitchen Appliance Count+1.0070%+0.060
Has Kitchen Island+0.6050%+0.050
Built-in Storage Count+0.3030%+0.050
Bathroom Count0.0030%+0.045
Has Fireplace+0.3030%+0.040
Bathroom Luxury Score0.0020%+0.040
Bathroom/Bedroom Ratio0.0010%+0.040
Separate Toilet Count+0.5030%+0.030
Has Separate Dining+0.5080%+0.030
Has Office/Study0.0020%+0.025
Adjustments & Metadata

Regional Coefficient

0.987

Postcode: 8500

ABEX Index Factor

1.000

Index value: 1000

Reference: 1000

Finishing Model

v102

e9380e41

Confidence Scores

SQM extraction0% — Low
QQP analysis55% — Low
Overall28% — Low

Processing Time

65.2s

Estimation ID: 8e1e413e-ab2f-45b1-ad9d-c7a13a18c6b0