Estimated Rebuild Cost

0 €

commercialComfort+
26-55302400042VerzamelPDF_20260428_1253.pdf254725/05/2026Low confidence — 33%
Cost Breakdown
Three-category calculation with regional and ABEX index adjustments
Category€/m²Cost
CAT1 — Livable
CAT2 — Enclosed non-livable
CAT3 — Outdoor built
Subtotal0 €
× Regional coefficient× 0.967
After regional adjustment0 €
× ABEX index factor(index 1000)× 1.000
Total Rebuild Cost0 €
Price per m² Formula
Linear interpolation from finishing coefficient F between the configured min and max prices

Finishing Coefficient F

1.244

Comfort+
BasicStandardComfortComfort+Luxury
// price per category:
price = min + (F − 0.70) / (1.500.70) × (max − min)
CategoryMin (F=0.7)Max (F=1.5)This buildingPosition
CAT1 — Livable
1 600 €2 900 €2 484 €
CAT2 — Enclosed
900 €1 500 €1 308 €
CAT3 — Outdoor built
500 €900 €772 €
Finishing Level Evidence
Quality/Quantity Parameters extracted from the building plan — sorted by model impactModel v102
36 parameters
ParameterScoreConfidenceWeightImpact
Has Wellness Area0.0030%+0.080
Has Dressing Room-0.5050%+0.060
Kitchen Appliance Count+1.0070%+0.060
Has Kitchen Island0.0020%+0.050
Built-in Storage Count0.0030%+0.050
Bathroom Count+1.0070%+0.045
Has Fireplace0.0030%+0.040
Bathroom Luxury Score-0.3035%+0.040
Bathroom/Bedroom Ratio+1.0070%+0.040
Separate Toilet Count+1.0070%+0.030
Has Separate Dining+0.5070%+0.030
Has Office/Study+0.5050%+0.025
Adjustments & Metadata

Regional Coefficient

0.967

Postcode: 2547

ABEX Index Factor

1.000

Index value: 1000

Reference: 1000

Finishing Model

v102

e9380e41

Confidence Scores

SQM extraction15% — Low
QQP analysis50% — Low
Overall33% — Low

Processing Time

121.6s

Estimation ID: 3cd08535-2a4a-41c8-b462-20acc56eb2ee